2D Output Interval!!!

classic Classic list List threaded Threaded
3 messages Options
Reply | Threaded
Open this post in threaded view
|

2D Output Interval!!!

M. L. Harris
Am I understanding correctly that ALL 2D output is written to the plan .hdf file (e.g., .p##.hdf)? Is the 2D output written at the computation interval? Is there any way to change the interval at which 2D output is written to the plan .hdf file?
M. L. Harris, P.E. | Water Resources Engineer
Reply | Threaded
Open this post in threaded view
|

Re: 2D Output Interval!!!

Luis Partida
I dont think thats possible. But remember "Mapping Interval" is not just for the visual representation in RAS mapper. For example if you run a d(t) of 1 second but map at 3 minutes....if you check your output hydrographs or structure hydrographs or flow over a weir, it will only have data at the "mapping interval" for which you have defined.
Reply | Threaded
Open this post in threaded view
|

Re: 2D Output Interval!!!

Jarvus
In reply to this post by M. L. Harris
It is only written at the mapper interval.  If you change mapper interval it will change the overall size of hdf file.

If you are curious, you can download a hdf viewer and look at the file.