no deposition in front of weir

classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

no deposition in front of weir

Nina
Hi,

I’m trying to perform a sediment transport analysis in a river reservoir in front of a weir for three years with closed gates. The weir is defined as an inline structure and the gate type is “overflow”. Although shear stress is almost zero, there’s no deposition upstream of the weir. Only with open sluice gates I get deposition.

Would you have any suggestions?